Interior shot of the theatre in Cambridge, as seen from the stage looking towards the seating.
Shot of the interior of the theatre, looking from a balcony towards the seating.
Shot of the theatre during a performance, showing in wide angle the stage and the audience.
No items found.

We won an invited design competition in 2021 to support Cambridge Arts Theatre Trust achieve a long-held vision to sensitively refurbish and upgrade their historic 666-seat auditorium, as well as create a second studio space to help diversify their offer.

The Grade II listed building is land-locked in a central heritage setting; the main auditorium much-loved for its unique proximity of audience and performers.

No items found.

We approached the project in two phases. Phase I, currently on site, is a carefully considered series of improvements to the historic theatre building.

An existing entrance on Peas Hill is sensitively reconfigured to relate to the heritage context of Georgian townhouses, offering a timber-framed shopfront to the theatre which comes alive during showtimes.

Within the historic auditorium, the introduction of a new curved balcony front, a widened proscenium and re-graded floors allow for a greater variety of performances to be mounted.

Modified stage and seating layouts are designed to improve sightlines and elevate audience/performer experience.

Cleverly integrated service upgrades ensure the theatre is at the forefront of technical provision, and acoustic improvements allow shows to run concurrently with the future studio space.

Front and back of house areas – including dressing rooms – are being renovated with materials and details drawn from the original building.

Phase II will deliver an innovative 200-seat studio, see Cambridge Arts Studio.

No items found.
Hand drawn sketch of an existing detail
Hand drawn existing landing detail
Photo of three balustrade elements from the existing building

These sensitively planned works will preserve the innate character of Cambridge Arts Theatre whilst ensuring it remains technically, functionally and experientially amongst the finest theatres in the UK.

No items found.
No items found.
No items found.
Axonometric drawing showing project's various structural elements coming together
No items found.
No items found.
No items found.
No items found.

“From the early stages, Ian Chalk Architects showed us imaginative ways a tired and impractical theatre could be revived. Echoes of the 1936 theatre remain, as they have skilfully reimagined the auditorium with exceptional craftsmanship as a sophisticated and welcoming home for the future of theatre in Cambridge.”

Lady Susie Sainsbury,

The Gatsby Foundation

“ICA have been true collaborative partners throughout the journey, taking time to listen to theatre users and understand the building they were entrusted with. The team were pragmatic and respectful but also knew when something was worth fighting for to retain the vision. The new design has transformed the auditorium and enhanced its intimate dynamic – it is a thing of beauty.”

Simon Harper,

Client’s Project Director at Harper Tackley Consultants

Client
​Cambridge Arts Theatre Trust
Location
Cambridge
Project Director
Harper Tackley
Project Manager
Savills
Planning Consultant
Turley
Lighting Consultant
Buro Happold
Services
Buro Happold
Structure
Buro Happold
Cost Consultant
Pulse
Sustainability
Sweco
Visuals & Photography
Pillar Visuals
Photography
Tim Soar
Photography
Philip Vile
Photography
Martin Bond
Main Contractor
Cocksedge Building Services
Specialist Technical Subcontractor
Push the Button
Specialist Joinery Subcontractor
Neil Burke Joinery
No items found.
:root {--size--2rem: clamp(1.65rem, 1.6785714285714286rem + 0.35714285714285715vw, 2rem);--size--2-5rem: clamp(2rem, 1.8571428571428572rem + 0.7142857142857143vw, 2.5rem);--size--3rem: clamp(2.25rem, 2.0357142857142856rem + 1.0714285714285714vw, 3rem);--size--3-5rem: clamp(2.375rem, 2.0535714285714284rem + 1.607142857142857vw, 3.5rem);--size--4rem: clamp(2.3rem, 2.0714285714285716rem + 2.142857142857143vw, 4rem);--size--4-5rem: clamp(2.75rem, 2.25rem + 2.5vw, 4.5rem);--size--5rem: clamp(3rem, 2.4285714285714284rem + 2.857142857142857vw, 5rem);--size--5-5rem: clamp(3.25rem, 2.607142857142857rem + 3.214285714285714vw, 5.5rem);--size--6rem: clamp(3.5rem, 2.7857142857142856rem + 3.571428571428571vw, 6rem);--size--6-5rem: clamp(3.75rem, 2.9642857142857144rem + 3.9285714285714284vw, 6.5rem);--size--7rem: clamp(4rem, 3.142857142857143rem + 4.285714285714286vw, 7rem);--size--7-5rem: clamp(4.25rem, 3.3214285714285716rem + 4.642857142857143vw, 7.5rem);--size--8rem: clamp(4.5rem, 3.5rem + 5vw, 8rem);--size--8-5rem: clamp(4.75rem, 3.6785714285714284rem + 5.357142857142857vw, 8.5rem);--size--9rem: clamp(5rem, 3.857142857142857rem + 5.714285714285714vw, 9rem);--size--9-5rem: clamp(5.25rem, 4.035714285714286rem + 6.071428571428571vw, 9.5rem);--size--10rem: clamp(5.5rem, 4.214285714285714rem + 6.428571428571428vw, 10rem);--size--11rem: clamp(5.75rem, 4.25rem + 7.5vw, 11rem);--size--12rem: clamp(6rem, 4.285714285714286rem + 8.571428571428571vw, 12rem);--size--13rem: clamp(6.5rem, 4.642857142857143rem + 9.285714285714286vw, 13rem);--size--14rem: clamp(7rem, 5rem + 10vw, 14rem);--size--15rem: clamp(7.5rem, 5.357142857142857rem + 10.714285714285714vw, 15rem);--size--16rem: clamp(8rem, 5.714285714285714rem + 11.428571428571429vw, 16rem);}